According to the workpiece sample provided by the customer, the overall equipment structure and configuration are designed, and the technical plan is made according to the customer's requirements. The technical plan includes the equipment general diagram, performance parameters, cost structure, delivery period, etc.
1. Test welding and proofing can be carried out according to the requirements of the customer. Some products require additional tooling and fixtures.
2. After both parties determine the technical plan, they sign a contract and pay a deposit. The delivery time starts from the delivery of the deposit.
3. The delivery time of customized products varies from 20 to 80 days.